Solar tender for 300 MW project annulled by SECI : Adani Green Energy

Adani Green Energy Ltd (AGEL) in its BSE filing said that a solar tender floated by  Solar Energy Corporation of India (SECI ) for 300 MW  power projects has been annulled.

Adani, through its wholly-owned subsidiary Mahoba Solar (UP) Private Limited bagged the solar tender floated by SECI.

“The said solar tender has been annulled by SECI,” the company said in a filing at the Bombay Stock Exchange.

With this, AGEL’s portfolio of renewable generation capacity now stands at 3.20 GWac with 1. 96 GWac operational projects and balance 1.24 GWac in development stage.