Suzlon secures 252 MW wind power project from CLP India

has announced its new order win for development of a 252 MW wind project from CLP .

Suzlon will install 120 units of S120-140m wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower, with rated capacity of 2.1 MW each.

The project is located in Sidhpur, Gujarat and is expected to be commissioned in 2022. 

Suzlon will execute the project with a scope of supply, foundation, erection and commissioning. Suzlon will also provide comprehensive operation and maintenance services post commissioning.

The S120-140m WTGs feature the time tested Doubly Fed Induction Generator (DFIG) technology that efficiently integrates into the utility network, to meet the grid requirements.

Suzlon’s next generation turbines are designed to optimally harness wind resources at higher altitudes making low wind sites viable.

Speaking on the order win, Ashwani Kumar, CEO, said, “We are delighted to partner again with CLP for their Wind Project in Sidhpur, Gujarat. CLP and Suzlon have enjoyed a long and fruitful association and share a common vision for an secure India powered by sustainable and sources of . This is the first big order that we have announced post our debt restructuring closure in line with our plans to restart business operations and lead the Indian from the front.  We are seeing an increased interest from all our stakeholders and customer segments to invest in energy. Suzlon’s expertise in the Indian over the last 25 years offers convenience and reliability to customers for setting up wind projects in India’s varied wind regimes.”

Advertisment